Dholera project trackers
The real build status of every Dholera mega-project in one board. Each figure is sourced and labelled reported or target. Progress bars are honest indicators, not official completion percentages, and every card links to the full sourced tracker.
Ahmedabad to Dholera Expressway
109 km greenfield access-controlled expressway, 4 lanes expandable to 8, design speed 120 km/h, agency NHAI.
Source note: Reported March 2026; cost stated Rs 3,196 cr (construction) to Rs 4,373 cr (with land), conflicting by scope.
Dholera International Airport
Single runway 3,200 m, Code 4E, phase 1. SPV DIACL (AAI 51%, Gujarat 33%, NICDC 16%), about 20 km from the SIR.
Source note: Reported 14 July 2026. Original December 2025 target was missed; no firm opening date is confirmed.
Tata to PSMC Semiconductor Fab
Tata Semiconductor Manufacturing, investment Rs 91,000 cr (about US$11B), up to 50,000 wafers per month, 300mm, mature nodes 28 to 110 nm.
Source note: Union Cabinet approval 29 Feb 2024; Fiscal Support Agreement 5 Mar 2025 (PIB). First chip is a target, not confirmed produced.
Dholera Ultra-Mega Solar Park
Ultimate announced target 5,000 MW by about 2030. Phase-I 1,000 MW sanctioned, agency Gujarat Power Corporation Ltd.
Source note: CEA quarterly report as on Sept 2025. The 5,000 MW figure is a long-range target, not installed capacity.
Ahmedabad to Dholera Semi-High-Speed Rail
About 134 km double line, cost about Rs 20,667 cr, roughly 45 minute journey. A cited 220 km/h speed is single-sourced and flagged.
Source note: Reported May 2026. Confirm cost and speed against PIB before treating as final.
ABCD Building and City Command Centre (ICCC)
Administrative cum Business Centre for Dholera in the TP2 Knowledge and IT Zone, houses the Integrated Command and Control Centre, the smart-city brain, LEED Gold design.
Source note: DICDL official interview 2024; built-up area figures differ by source (about 14,000 to 36,000 sqm), flagged.